Demonstration Environment — Synthetic Data.
Decision CenterDecision Engine Output

Decision Intelligence

Turning predictions into contextual operational decisions.

Decision Case
DI-2026-0922-001
Opened 22 Sep 2026, 14:05
Asset
M-103
CNC Machining Center
Trigger
Predictive Maintenance Alert
PM-2026-184
Prediction (input)
78% bearing failure risk within 5–8 days
RECOMMENDEDAwaiting approval

Context Considered

Data the predictive model does not see
1.Machine Risk
Failure Probability
78%
Est. Failure Downtime
12 hours
2.Production
Utilization
91%
Open Orders
14
Critical Orders
3
Next Low-Load Window
Saturday 22:00–01:00
3.Customer Impact
Orders potentially affected
3
Priority Customer
PT Nusantara Components
SLA Risk
MEDIUM
4.Spare Part
Part
SPB-440 Spindle Bearing
Inventory
2 units
Location
Jakarta Maint. Warehouse
Status
AVAILABLE
5.Technician
Required Skill
CNC Mechanical Maint.
Team A
Unavailable
Team B
Available Sat 21:00–02:00
6.Backup Capacity
Backup Asset
M-104
Available Capacity
72%
Can absorb production
YES
7.Cost
Planned Maintenance
Rp 18M
Est. Unplanned Failure
Rp 145M
Potential Avoided Exposure
Rp 127M
8.Safety / Operational Risk
Safety Risk
Medium
Operational Criticality
High

Decision Engine · Transparent multi-factor model

Decision Engine Output
FactorWeightNormalized score (0–100)Weighted
Failure Risk
78% probability, +14 pts in 48h (+6)
25%
84
21.00
Operational Criticality
High criticality
20%
95
19.00
Production Impact
91% utilization · 12h downtime · 72% backup
20%
90
18.00
Customer / SLA Impact
3 critical orders · SLA risk Medium
10%
85
8.50
Resource Availability
Qualified team available in window
10%
80
8.00
Spare Part Availability
Part in stock
5%
100
5.00
Safety Risk
Medium safety risk
5%
60
3.00
Cost Exposure
Rp 145M unplanned exposure
5%
97
4.85
Decision Priority Score
87
/ 100
HIGH
AI Recommended Action
Schedule preventive maintenance for M-103.
RECOMMENDED
Recommended Window
Saturday
22:00–01:00
Recommended Team
Maintenance Team B
CNC Mechanical
Required Part
SPB-440 Spindle Bearing
1 unit
Expected Downtime
3 hours
planned
Est. Avoided Exposure
Rp 127M
vs unplanned failure
Confidence
89%
decision confidence
Production Mitigation: Shift affected production to M-104 beginning 20:00.
View Alternatives
Why this action?
  • Failure risk is high and increasing
  • Production demand is lower Saturday night
  • Required spare part is available
  • Qualified technician is available
  • Backup machine M-104 has sufficient capacity
  • Three critical orders remain protected
  • Planned intervention is significantly cheaper than unplanned failure
Generative AI Explanation

M-103 is likely to suffer spindle bearing failure within 5–8 days. Waiting for Saturday night keeps risk acceptable while avoiding any impact on the three priority orders for PT Nusantara Components. Team B and the SPB-440 bearing are both available in that window, and M-104 can absorb production from 20:00 — making a Rp 18M planned stop far preferable to a potential Rp 145M unplanned failure.

Narrative generated from decision-engine outputs. It explains the decision; it does not make it.